| Rules |
Title/Description |
Date |
PDF |
| Rule 2-003 |
Record of Electrical Work, relocated |
Jul/08 |
 |
| Rule 2-003 |
Definitions |
Jul/08 |
 |
| Rule 2-003 |
Record of Electrical Work, relocated |
Jul/08 |
 |
| Rule 2-006 |
Periodic Inspection |
Jul/08 |
 |
| Rule 2-012 |
Connection Authorization |
Jul/08 |
 |
| Rule 2-022 |
Sale or Other Disposal and Use |
Jul/08 |
 |
| Rule 2-030 |
Deviation or Postponement |
Jul/08 |
 |
| Subrules 4-004 (17), (18), (19) and (20) |
Ampacity of Wires and Cables, deleted |
Jul/08 |
 |
| Rule 10-500 |
Effective Grounding |
Jul/08 |
 |
| Rule 10-511 |
Equipment on Structural Metal, deleted |
Jul/08 |
 |
| Subrule 14-308 (1) |
Battery Control Power for Circuit Breakers, deleted |
Jul/08 |
 |
| Subrule 26-700 (12) |
Receptacles General, deleted |
Jul/08 |
 |
| Rules 30-500 to 30-510 |
Luminaires in Buildings of Residential Occupancy, added |
Jul/08 |
 |
| Rule 68-000 |
Scope |
Jul/08 |
 |
| Rule 68-050 |
Special Terminology |
Jul/08 |
 |
| Rule 75-000 |
Scope |
Jul/08 |
 |
| Rule 75-002 |
Definitions |
Jul/08 |
 |
| Rule 75-004 |
General Requirements |
Jul/08 |
 |
| Rule 75-200 |
Poles |
Jul/08 |
 |
| Rule 75-202 |
Equipment Attached to Poles |
Jul/08 |
 |
| Rule 75-206 |
Wood Poles |
Jul/08 |
 |
| Rule 75-214 |
Guying of Steel Poles |
Jul/08 |
 |
| Rule 75-218 |
Steel Pole Requirements |
Jul/08 |
 |
| Rule 75-234 |
Attachment of Secondary Service Conductors |
Jul/08 |
 |
| Rule 75-239 |
Fiber-Reinforced Polymer Poles, added |
Jul/08 |
 |
| Rule 75-252 |
Anchoring for Change of Line Direction |
Jul/08 |
 |
| Rule 75-260 |
Hardware |
Jul/08 |
 |
| Rule 75-264 |
Braces for Crossarms on Primary Lines |
Jul/08 |
 |
| Rule 75-304 |
Location of Conductors on Primary Lines |
Jul/08 |
 |
| Rule 75-308 |
Span with Secondary Service Line Attached to Building or Mobile Homes |
Jul/08 |
 |
| Rule 75-310 |
Primary and Secondary Lines Clearances |
Jul/08 |
 |
| Rule 75-312 |
Clearances of Conductors from Buildings |
Jul/08 |
 |
| Rule 75-314 |
Clearances for Other Structures |
Jul/08 |
 |
| Rule 75-318 |
Sag Between Poles |
Jul/08 |
 |
| Rule 75-320 |
Sag Between Pole and Building |
Jul/08 |
 |
| Rule 75-324 |
Attachment of Secondary Line Service Conductors |
Jul/08 |
 |
| Rule 75-326 |
Tree Trimming |
Jul/08 |
 |
| Rule 75-328 |
Submarine Power Cable |
Jul/08 |
 |
| Rule 75-402 |
Crossarms |
Jul/08 |
 |
| Rule 75-404 |
Grounding Overhead Installations |
Jul/08 |
 |
| Rule 75-408 |
Grounding the Service Box on a Transformer Pole |
Jul/08 |
 |
| Rule 75-410 |
Grounding of Service Equipment on Transformer Poles, deleted and Neutral Voltage Mitigation Devices Installed on Transformer Poles, added |
Jul/08 |
 |
| Rule 75-412 |
Grounding/Bonding in Milking Areas, deleted |
Jul/08 |
 |
| Rule 75-504 |
Service Box Installation |
Jul/08 |
 |
| Rule 75-506 |
Conductors at Service Switch, deleted |
Jul/08 |
 |
| Rule 75-602 |
Pole Mounted Luminaires |
Jul/08 |
 |
| Rule 75-604 |
Lighting Fixtures , deleted and Roadway Lighting Systems, added |
Jul/08 |
 |
| Rule 75-606 |
Silo Unloaders, deleted And Aerially Supported Cables, added |
Jul/08 |
 |
| Rule 75-608 |
Standby Generators, deleted |
Jul/08 |
 |
| Rule 75-610 |
Hazardous Locations, deleted |
Jul/08 |
 |